DOI 10.60531/INSIGHTOUT.2024.2.6| FRAUWALLNER: IN//OUT OF FRAME_ INSIGHTOUT 2(2024) 33 Fig. 2:: image titled"Otavi-Bahn: laying of corrugated metal pipes" does not acknowledge the presence of the depicted African laborers, among them women. Fig. 3: image titledOtavi-Bahn: well construction at Otjivarongo, km 378. the image and focuses instead on the technical task of installing metal pipes(fig.2). 21 Similarly, the four women present in the image entitled Otavi-Bahn: Brunnenbau in Otjivarongo, km 378 [Otavi Railway: Well-Building in Otjiwarongo, km 378] provides more information on the location and construction site at hand than any of the eight people engaging in the task(fig.3). 22 21 TMW, Archiv für österr. Eisenbahngeschichte, EA- 002742-35, Arthur Koppel Aktiengesellschaft, Zur Erinnerung an den Bau der Otavibahn 1903–1906, Berlin(1907). 22 TMW, Archiv für österr. Eisenbahngeschichte, EA- 002742-37, Arthur Koppel Aktiengesellschaft, Zur Erinnerung an den Bau der Otavibahn 1903–1906, Berlin(1907).